Is that for the cable or FTTP deployment on the island itself? Seems like they could at least get much better mobile internet rates using the subsea cable instead of satellite for backhaul.
I had a very difficult time trying to figure out if that subsea cable was online or not.
> Due to delays in finalising designs for the new network, it is now accepted that it will not be completed by January 2024
If they haven't finalized the design, I'd say they've got a ways to go.
Is that for the cable or FTTP deployment on the island itself? Seems like they could at least get much better mobile internet rates using the subsea cable instead of satellite for backhaul.
I had a very difficult time trying to figure out if that subsea cable was online or not.
Per the ISP (Sure), it does appear to have been rolled out: https://www.sure.co.sh/assets/Banner-Links/PRESS-RELEASE-Con...