← Back to context

Comment by xiconfjs

6 hours ago

I have to second this. While it takes mich effort and in-depth knowledge do build up from an “empty” cage it’s still far from dealing with everything from building permits, to plan and realize a data center to code including redundant power lines, AC and fibre.

Still kudos going this path in the cloud-centric time we live in.

While it is more complex to actually build out the center , a lot of that is specific to the regional you are doing it.

Thy will vary by country, by state or even county , setting up a DC in the Bay Area and say one in Ohio or Utah is a very different endeavor with different design considerations.

Do I have stories.

One of the better was the dead possum in the drain during a thunderstorm.

>So do we throw the main switch before we get electroduced? Or do we try to poke enough holes in it that it gets flushed out? And what about the half million in servers that are going to get ruined?

Sign up to my patreon to find out how the story ended.