Comment by marze
5 hours ago
Against the cost of a lower payload fraction. Say you get 4% with TSTO, 2% with SSTO. And if you run into trouble with the design, the SSTO payload moves towards 0%. Your operational savings need to compensate for a doubling of cost per unit mass payload, possibly much more.
And even though full reusability is much easier with two stages, and has not been achieved yet.
No comments yet
Contribute on Hacker News ↗