Comment by lazide
4 hours ago
According to the preliminary report, 3 of the 4 showed fatigue cracks, and the 4th overstressed. So yes, agree a random sample of these parts should be pulled from the fleet and tested - but something pretty crazy was happening here re: fatigue.
That it was so far from the maintenance schedule to be inspected AND that the fatigue cracks seem to have formed in areas that would be hard to visually inspect anyway points to either a engineering problem (especially bad, since the DC10 problem of a similar nature happened in roughly the same parts, albeit due to different abuse - you’d think the engineers would overdo it there, if nothing else), or some specific type of repeated abuse that particular pylon received, which is pointing more to a design problem.
> you’d think the engineers would overdo it there, if nothing else
No kidding, especially given the lack of redundancy in the design.