← Back to context

Comment by throwup238

9 hours ago

> A single AI data center server rack takes up the same energy load of 0.3 to 1 international space station.

The ISS is powered by eight Solar Array Wings. Each wing weighs about 1,050kg. The station also has two radiator wings with three radiator orbital replacement units weighing about 1,100kg each. That's about 15,000 kg total so if the ISS can power three racks, that's 5,000kg of payload per rack not including the rack or any other support structure, shielding, heat distribution like heat pipes, and so on.

Assuming a Falcon Heavy with 60,000 kg payload, that's 12 racks launched for about $100 million. That's basically tripling or quadrupling (at least) the cost of each rack, assuming that's the only extra cost and there's zero maintenance.

Falcon Heavy does not cost 100M when launching 60 metric tons.

At 60 metric tons, you're expending all cores and only getting to LEO. These probably shouldn't be in LEO because they don't need to be and you probably don't want to be expending cores for these launches if you care about cost.

The real problem typically isn't weight, it's volume. Can you fit all of that in that fairing? It's onli 13m long by 5m diameter...