Comment by instig007
6 days ago
> I know of one person who got fired from a project due to no small fact that building the system he was presented with took > 24 hours when a full build was triggered, and this happened every week.
Incremental Nix builds can take less than 1 munute to build everything, including the final deployable docker image with a single binary on very large Haskell codebases. That fact the the person was fired for everybody around him systematically failing to admit and resolve a missing piece of supportive infrastructure for the engineering effort of one person tells a lot about the overall level of competence in that team.
> but ultimately it is a failing of the "everything and the kitchen sink" philosophy at play in dependency usage.
Not really, as the kitchen sink only has to build once per its version change, for all future linkage with your software for the entire engineering team doing the builds in parallel.