← Back to context

Comment by Aurornis

8 hours ago

All projects have an interconnection fee.

Large projects will have a large load interconnection tariff that’s supposed to shoulder the costs of upgrading the infrastructure to support these new projects.

Data center discussions are weird right now because people assume these things don’t exist and propose them as solutions. They already exist.

The problem in the article is something different: The sites they’re talking about are designed to disconnect from the grid and use backup power when the voltage drops, which can be a problem because now there’s too much energy being supplied to the grid and not enough load to absorb it.