← Back to context

Comment by tenthirtyam

2 hours ago

I've often thought that the target* grid phase should be encoded into a high frequency signal, say at 50kHz. Generators without inertia can immediately switch to the required phase and inertial systems can work towards it or disconnect their outputs if they stray too far.

The problem in my mind is that, as it stands, the signal that everyone has to latch on to is itself affected by load and by different generators latching on with different time constants in a complicated feedback loop. Would having a single authoritative source be an improvement? Would that be a way to eliminate the need for inertia?

*I suppose the "target" phase would probably be based primarily on the output from the biggest inertial systems and take into account their ability to adjust phase and frequency.