My completely uninformed perspective: There's a danger here, in that we're rolling out all at once, which means infra will reach EOL all at once. Replacement costs of suburban infra is killing a lot of American municipalities that can't grow in order to generate the taxes to cover those replacement costs of water infra and such.

More solar asap is definitely a good thing, but we also need to plan for what happens 30-40 years from now when this wave of equipment starts failing.

I wouldn't worry about it too much. Electric generation is a business and existing sites will be prime locations for new panels (likely straightforward to permit, connection to the grid, etc.).

Municipalities often have bonkers cost structures and imposed limits on tax increases (limits in state laws and such). Here they are redoing lead service lines, rebuilding substandard water mains and repaving streets. State and Federal grants are paying for a lot of it, along with increases to water rates (to maybe 5-10% above the national average, enough to make people unhappy, but not out of control).

Solar plant consists of thousands of panels. Each panel can have different failure mode and time. They are all monitored and can be replaced on an ongoing basis.

Fortunately the grid storage rollout is happening at a blistering pace too. Reported payback of investment for 2 years for many of the early rollouts (due to arbitrage between peak/off peak prices) and while that won't last it's still amazing economics.

The end state of solar and wind will be a system that is overbuilt, potentially by a large factor. Overbuilding solar by 10x, for example, means that solar can still satisfy the grid when it’s thickly overcast.

Well, that will certainly be an issue for nuclear power capacity in the future.

  • The primary cost for nuclear is the initial construction. An operating plant has the wear items replaced on a regular basis as part of normal maintenance, so it's more like Ship of Theseus than something that has a specific lifetime.

    • >The primary cost for nuclear is the initial construction.

      That's a common claim but it's not really correct.

      Firstly, the average plant in the US spends it's construction costs every 2-3 years, I assume the situation is similar in the EU. New power plants are much more expensive of course, because the old ones were built before Chernobyl, Fukushima, 9/11 and other incidents that revealed horrible security flaws in existing plants and procedures.

      Secondly, the costs of handling Chernobyl are way, way higher than the total cost of construction for all nuclear plants in the EU combined. Similarly the cost of managing Fukushima is way higher than the cost of constructing all the nuclear plants in Japan. These costs are of course never added to the cost of nuclear power, since nobody operating nuclear plants has any chance of paying such sums. But they are in fact a larger factor than the construction costs were.

      These experiences did have some effect, thankfully, in that made new power plants more expensive, because we know that we must take any conceivable measure to prevent more Chernobyls and Fukushimas from happening.

      And thirdly, the reason why Sweden closed the two most recent reactors was cost, despite them being paid off a long time ago. Meaning there is significant cost even after the construction is paid.

      So it seems that the claim that "construction is the main cost" comes from the operator's point of view. Basically "the construction is the largest part WE have to pay, because taxpayers cover the rest".

      6 replies →

    • That works for things like auxiliary pumps, but replacing the reactor vessel or control room is going to be a completely different game. And all of that is made even worse because of the whole "nuclear" part, with plenty of critical parts becoming irradiated and essentially impossible to touch unless you let it rest for a couple of decades. On top of that it locks you in to an old reactor design, which might be very undesirable for safety reasons.

      At a certain point it just becomes cheaper to build a brand-new one right next to it and decommission the old one, even with a nuclear reactor.

      1 reply →

    • Hopefully, small modular reactors (SMRs) bring down construction costs and build times significantly. The economics would be better than 2010s fossil fuel prices if companies like NuScale and TerraPower deliver on their ambitious, but attainable promises.

Suburban America is dying because it is operating like a Ponzi scheme: the property taxes aren't high enough to pay for the long-term maintenance and replacement of infra, and for the past handful of decades it has compensated by filling the budget holes with one-off windfalls due to taxes on new development.

This house of cards obviously falls down when expansion ever slows down. The only solution is to raise the property taxes per yard of road, but that means low-density housing becomes unaffordable, which would force towns to increase density by building things like row houses and apartment buildings.

Solar is in a completely different position, as the solar itself is profitable. There will be no shortage of cash to replace it, only perhaps a shortage of labor. But solar doesn't really have a fixed lifetime and will happily operate a few years longer, and due to its highly distributed nature it doesn't require a risky all-at-once replacement like the Boston Big Dig either.

The global solar rollout is going slow enough that it won't be finished before the first units will reach the end of their economical lifespan. I reckon it'll just shift into ongoing maintenance as time goes on.

Explain the mechanism by which you believe photovoltaic panels start failing.

Your concern would be valid for a nuclear thermal power station, a Goldberg machine with millions of moving parts. It is not really applicable to semiconductors.

  • Everything fails given a long enough time span.

    For solar PV it is ~30 years.

    While the cell may continue to generate power, it may have diminished so greatly as to no longer justify its physical footprint

    • Yes, and no.

      So, as a rule of thumb, the solar panel loses approximately 1% per year. So after 30 years it's generating around 70% of rated capacity.

      At that (or any earlier or later) point one could replace the panels. That's really cheap to do, and can be done with more-or-less unskilled labor.

      If you are space-constrained (like your residential roof) then you'll likely do it earlier.

      If you are a commercial producer, sitting in a desert somewhere, it'll likely be better to just "plant another field" next door. Keep the 70% (it's free), and bolster capacity by adding more panels, not replacing old ones.

      And this is before we take into account places where the ecology under the panels has changed and become more valuable in its own right.

      So 25 years from now, or maybe 10 years from now, it might pay to replace panels. Which may in turn lead to very cheap 75% 2nd hand panels becoming widely available.

      4 replies →

    • None of the generation options have tightly controlled lifetimes. So that means you can always "put off" work to some extent and that hasn't changed between a Coal power plant and Solar farms. Similar to transport infrastructure, if you're a democracy your voters will be very angry if you "waste" money on maintenance and they'll also be very angry if you don't do the work and then bad things happen.

      1 reply →

You just replace it with more solar panels like what is so complicated about this? Also, this stuff is growing every year. It’s all staggered.