Comment by stonogo

2 days ago

They do obey the law: they're required to pull onto a siding to allow Amtrak to stay on time. So the operators ensure the train is too long for any of the sidings, which fits them into an escape clause. Any cargo train stuck waiting for Amtrak simply isn't fully stacked yet.

Closing that loophole is what the government is dragging its feet about.

From wikipedia

> United States – BNSF Railway and Union Pacific Railroad (UP) regularly operate intermodal container trains exceeding 5,000 metres (16,500 ft) in length on main lines in the western United States. On the UP, these trains can stretch to over 6,100 metres (20,000 ft) with 5 locomotives and 280 well cars.

Those are incredible figures. It would almost be a shame to ban such amazing monuments to engineering. Not to mention that it's probably the most efficent and enviromentally friendly way to do things.

  • It's not due to the logistics of rail labor and a bunch of other things. I forget the math but smaller trains can run more often without sitting for hours and take advantage of fuel and labor better.

    the podcast well there's your problem covered it in deep detail