← Back to context

Comment by wolvoleo

3 hours ago

But like the OP says this particular infrastructure area was brand new.

I think much manufacturing adheres to the die-young, die-old principle (Often mentioned in the Backblaze reports), manufacturing defects shows up early on, time of stillness and then as it ages it starts to fail.

The tracks were laid in May 2025, that means no winters had passed before now and any defects in the tracks due to temperature differences hadn't had a chance to appear before now.

  • Railways are neither consumer electronics, nor software. There is a final inspection after construction work, in which the network operator releases the constructor from responsibilities, which should catch any issues. When the network operator later claims, that there was a manufacturing defect, the first question is why didn't it has known earlier, because that is their job.

But brand new doesn't mean the repairs / mainenance were done correctly. It could both be brand "new" and defective.

We've seen lots of serious fuck ups in Europe lately: including for a start several cases of maintenance improperly done on big passenger planes that nearly led to hundreds of passengers deaths (several planes have been diverted in the last months and the cause was improper maintenance).

I'm not saying improper repairs/maintenance on the rails are the cause: I'm saying it's a fact we've seen improper repairs/maintenance on passenger planes in the recent months.