Comment by Animats

23 days ago

Which matters, because Doctor Yellow inspection trains can be put into the schedule with the regular trains. There's no need to shut down traffic while a slow inspection car chugs along.

BART recently got a full-speed inspection car.[1] They needed a specially built one because BART has a non-standard track gauge.

The Federal Railroad Administration has track inspection cars, but only six of them for the whole country. One was seen on CALTRAIN track.[2]

[1] https://www.youtube.com/watch?v=GHa1Si7CW8Q

[2] https://www.youtube.com/watch?v=RQcRHn9YiPg