    > Was funding really secure?

It's worth breaking down what the "funding" means over here. As this is a depressing topic for me, I'm going to be a bit playful. :)

The Saturn V's existed. Saturn V serial numbers were designated as S-5## where # is an increment from 1. https://en.wikipedia.org/wiki/Saturn_V#Launch_history <--- see the Saturn V numbering scheme here.

SA-513 was repurposed from Apollo 18 to Skylab. SA-514 was meant for Apollo 19. They put it on display. SA-515 was also chopped up and put on display. Some parts were used in Skylab. https://www.space.com/nasa-extra-apollo-moon-saturn-v-rocket...

So there were 3 Saturn V already assembled and in existence.

Did the CSMs and LEMs exist? CSMs had a similar serial number scheme. And they designated "Block 1" and "Block 2" (iterations of the spacecraft design based on testing) CSM-0## and CSM-1##

The CSM used in Apollo 17 was CSM-114. On wikipedia it says that CSM-115 and CSM-115a were never fully assembled and cancelled, but if you look past that, you can also see that Skylab used, CSM-116, CSM-117 and CSM-118. These were Apollo CSMs, fresh off the same assembly line. https://en.wikipedia.org/wiki/Apollo_command_and_service_mod...

So there were 3 CSMs.

What about LEM? Similar number scheme, LM-## which is incremented with each one made. So first one was LM-1 and the last one used on Apollo 17 was LM-12. LM-13 is on display in a museum. LM-14 was on the production line (along with LM-15??) and a "stop work" order was issued and they were scrapped. Yes, they were literally broken down and turned into scrap. https://www.businessinsider.com/nasa-lunar-modules-lm14-lm15...

So NASA had 1 LEM and 2 were on the way. I think, we can charitably say that there were 3 LEMs available at the time. I think it's fair to say that...

There were 3 LEMs.

Did they have 3 crews? Funnily enough, they did have 3 crews already assigned! What a coincidence. https://web.archive.org/web/20181224161154/https://nssdc.gsf... :)

So the Saturn Vs existed and had been paid for. The CSMs existed and had been paid for. The LMs existed / were on the line and had been paid for. The crews existed (and had been partially paid for).

So what is the "funding shortfall" that caused America to stop going to the moon?

The "funding shortfall" here is the money required to pay for the ground crews and personnel for carrying out the mission. And that amount was $42.1 million out of $956 million for Apollo. The total NASA budget was, $3.27 billion that year.

   > NASA was canceling Apollo missions 15 and 19 because of congressional cuts in FY 1971 NASA appropriations, Administrator Thomas O. Paine announced in a Washington news conference. Remaining missions would be designated Apollo 14 through 17. The Apollo budget would be reduced by $42.1 million, to $914.4 million - within total NASA $3.27 billion.

$42.1 million. NASA admin just couldn't find $42.1 million of ground staff salaries etc out of the remaining $2.3 Billion budget.

It's probably a coincidence that this happened right after Apollo 13. The decision was announced on September 2nd, 1970. Apollo 13 happened in April, 1970.

----

So yes, the funding was there. I suspect the "funding cut" argument was an attempt to save face; after the US Government (and I mean the Government, it's clear both the White House and Congress were involved) decided to cut the cord post-Apollo 13.

I also suspect this is one of the many "open secrets" lost to time. It might have been known by "everyone" in the know at the time, but those who knew died off, and history crystallized around the written page.

Thank you for the in depth reply! You make a very good point, and the timing of Apollo 13 with the budget decision is pretty damning, I'm convinced.

I will point out however that the budget was congressionally-mandated, and no funds were allocated for moon landings as they were in previous years; it would have been illegal to use funds dedicated to other areas for moon landings. Maybe I'm being overly pedantic here, but to say the 'funding was secured' as in the article implies the decision to cancel the remaining programs lay with NASA leadership; it would be more accurate to say that funding for the remaining programs, though possible, was not secured, most likely as an attempt to save face by congress/govt.

  • No, that's a great point. Let me rephrase it, they couldn't go to congress in 1970 and say, "hey, we've got $2.3B in other parts of NASA, here's what we're happy to cut so that we can keep Apollo."

    Apollo 18, 19 and 20 were cancelled in 1970. 3+ years ahead of Apollo 18. Apollo 17 didn't happen until December 1972.

    The US couldn't plug this funding "shortfall" in 3+ years out of the many, many parts of NASA?

    It's pretty clear that the decision to kill Apollo had been made. The money is just how they chose to do it so that the POTUS didn't have to go on record cancelling Apollo. There was no room for negotiation. POTUS and Congress had decided that Apollo needed to die and so it died. How it died was relevant only so far as to serve as a mechanism to save face.

        > the 'funding was secured' as in the article implies the decision to cancel the remaining programs lay with NASA leadership
    

    Yes, you're right. I just don't know how else to put it. The capital outlays for the components of the missions had already been committed to ahead of time. The physical capital was present; the main cost of the missions; those assets existed / were in place. I don't know what the right language is over here.