Terrestrial data centers are having a hard time connecting to power. What’s the good of a $40/Watt compute asset you can’t turn on? Spending $10 or even $20/Watt extra to get power by sending inference load to orbit starts to sound like a bargain, and that’s doable with today’s launch vehicles. With high reuse, that number drops to below $1/Watt for 24/7 power, which makes it cheaper than any terrestrial energy source. And the vast majority of compute load is inference. Part of the training process benefits from a large, coherent (ie low latency) data center, but that’s a minority of the load nowadays.
Also: low Earth orbit is already pretty low latency. A lot of people’s intuitions about space latency are from when satellite internet was based out of distant geosynchronous satellites, but even that is probably just fine for most inference workloads.
Talking starmind.
150kw design Launch on 4000kg is 4 million. 150kw solar Radiator Electronics
20/watt is 3 million. We are above your budget.